The Payne Lake canal rehabilitation project on the canal banks along the MVLA canal system extends approximately 4 km SW of Mountain View, Alberta, in Cardston County. This project included excavating canal slope material, supplying and installing gravel armour and installing a canal crossing. This phrase was followed by the installation of a reservoir level monitoring system and a seepage collection system to provide seepage mitigation to the dam.
We were pleased to participate in the downtown rehabilitation project in Bellevue, Alberta. East Butteās contribution included excavation, sanitary sewer, storm system and water distribution replacements. We also provided concrete curbs, sidewalks, landscaping and street furniture for the beautification phase of the project.
121 Hwy Ave
Picture Butte
Alberta
Canada
T0K 1V0
(403) 745-0023
accounting@eastbutte.com
eastbutte.com
Monday-Friday, 8 am – 5 pm
Copyright 2024 – East Butte – All Rights Reserved
Website by: AMG